Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/11000/34256
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorAnton-Sanchez, Laura-
dc.contributor.authorALCARAZ, JAVIER-
dc.contributor.authorSaldanha-da-Gama, Francisco-
dc.contributor.otherDepartamentos de la UMH::Estadística, Matemáticas e Informáticaes_ES
dc.date.accessioned2025-01-10T08:56:06Z-
dc.date.available2025-01-10T08:56:06Z-
dc.date.created2022-
dc.identifier.citationJournal of Manufacturing Systemses_ES
dc.identifier.issn1878-6642-
dc.identifier.issn0278-6125-
dc.identifier.urihttps://hdl.handle.net/11000/34256-
dc.description.abstractThis work provides new insights on bi-criteria resource-constrained project scheduling problems. We define a realistic problem where the objectives to combine are the makespan and the total cost for resource usage. Timedependent costs are assumed for the resources, i.e., they depend on when a resource is used. An optimization model is presented and it is followed by the development of an algorithm aiming at finding the set of Pareto solutions. The intractability of the optimization models underlying the problem also justifies the development of a metaheuristic for approximating the same front. We design a bi-objective evolutionary algorithm that includes problem-specific knowledge and is based on the Non-dominated Sorting Genetic Algorithm (NSGA-II). The results of extensive computational experiments performed using instances built from those available in the literature are reported. The results demonstrate the efficiency of the metaheuristic proposed.es_ES
dc.formatapplication/pdfes_ES
dc.format.extent18es_ES
dc.language.isoenges_ES
dc.publisherElsevieres_ES
dc.relation.ispartofseries63es_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectResource-constrained project scheduling problemes_ES
dc.subjectTime-dependent resource costses_ES
dc.subjectMakespanes_ES
dc.subjectMulti-objective optimizationes_ES
dc.subjectExact Pareto frontes_ES
dc.subjectMetaheuristicses_ES
dc.subject.otherCDU::5 - Ciencias puras y naturales::51 - Matemáticases_ES
dc.titleBi-objective resource-constrained project scheduling problem with time-dependent resource costses_ES
dc.typeinfo:eu-repo/semantics/articlees_ES
dc.relation.publisherversionhttps://doi.org/10.1016/j.jmsy.2022.05.002es_ES
Aparece en las colecciones:
Artículos Estadística, Matemáticas e Informática


Vista previa

Ver/Abrir:
 2022 Alcaraz-et-al-JMS.pdf

2,44 MB
Adobe PDF
Compartir:


Creative Commons La licencia se describe como: Atribución-NonComercial-NoDerivada 4.0 Internacional.