Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/11000/32295

Optimization of the pick-and-place sequence of a bimanual collaborative robot in an industrial production line


Vista previa

Ver/Abrir:
 s00170-023-12922-9.pdf

2,25 MB
Adobe PDF
Compartir:
Título :
Optimization of the pick-and-place sequence of a bimanual collaborative robot in an industrial production line
Autor :
Borrell Méndez, Jorge  
Perez-Vidal, Carlos
Segura-Heras, José Vicente  
Editor :
Springer
Departamento:
Departamentos de la UMH::Estadística, Matemáticas e Informática
Fecha de publicación:
2024-01-13
URI :
https://hdl.handle.net/11000/32295
Resumen :
This paper focuses on optimising pick-and-place tasks performed by a dual-arm collaborative robot in a specific shoe manufacturing industry environment. The robot must identify the pieces of a shoe placed on a tray, pick them up, and place them in a shoe mold for further processing. The shoe pieces...  Ver más
Palabras clave/Materias:
Global optimization
Binary Integer Linear Programming (BILP)
Pick-and-place
Robotics
Área de conocimiento :
CDU: Ciencias puras y naturales: Matemáticas
Tipo de documento :
info:eu-repo/semantics/article
Derechos de acceso:
info:eu-repo/semantics/openAccess
DOI :
https://doi.org/10.1007/s00170-023-12922-9
Aparece en las colecciones:
Artículos Estadística, Matemáticas e Informática



Creative Commons La licencia se describe como: Atribución-NonComercial-NoDerivada 4.0 Internacional.