Search
Add filters:
Use filters to refine the search results.
Results 1-3 of 3 (Search time: 0.006 seconds).
- previous
- 1
- next
Item hits:
Preview | Issue Date | Title | Author(s) | Access |
---|---|---|---|---|
2021 | Conceptual and preliminary design of a shoe manufacturing plant | |||
10-Nov-2020 | Robotic Pick-and-Place Time Optimization: Application to Footwear Production | |||
13-Jan-2024 | Optimization of the pick-and-place sequence of a bimanual collaborative robot in an industrial production line | Borrell Méndez, Jorge; Perez-Vidal, Carlos; Segura-Heras, José Vicente |
Discover
Subject
Access rights