Title: Centros educativos ilicitanos: 20 años de crisis provisionales |
Authors: Pastor Hernández, María |
Tutor: Carvajal Prieto, Miguel |
Editor: Universidad Miguel Hernández de Elche |
Department: Departamentos de la UMH::Ciencias Sociales y Humanas |
Issue Date: 2020-07-15 |
URI: http://hdl.handle.net/11000/27245 |
Abstract:
La ciudad de Elche cuenta con 77 centros de educación públicos entre guarderías,
colegios e institutos, el 21% de los cuales necesita una intervención infraestructural urgente.
Además, la mayoría de ellos la lleva esperando una media de 10 años.
Hace tres años, Elche se adhirió al Plan Edificant, un proyecto lanzado desde
Conselleria de Educación para trasladar a los ayuntamiento la responsabilidad de escoger
los centros que necesitan una actuación. Una vez aprobados, Conselleria los financiará.
Actualmente se han incorporado 11 centros, a la espera de la autorización de dos más. Por
otra parte, la Conselleria de Educación está a cargo de las obras del colegio de La Paz, el
instituto de Torrellano y el nº 11.
El objetivo principal de las intervenciones en Elche era terminar con los barracones
que 6 centros están utilizando incluso durante más de 20 años. Además, se arrastran otros
problemas como la presencia de amianto en paredes y tejados de algunos edificios.
La larga espera de todas estas intervenciones han provocado múltiples
manifestaciones en la comunidad educativa. En dos años la mayoría de estas obras estarán
concluidas si no hay más retrasos.
The city of Elche has 77 public educational centres counting nurseries, primary
schools and high schools. 21% of these institutions need an urgent infrastructural
intervention, which most of them have been waiting for 10 years in average.
Three years ago, Elche joined the project Plan Edificant. This project was launched
by Conselleria de Educación and it aimed to transfer to city councils the responsibility of
selecting the centres with higher priority for action to be taken. Once the renovation plans
have been approved, Conselleria will finance them. At present, 11 centres have been
incorporated and two more are awaiting the authorisation. Besides that, the rebuilding works
at La Paz primary school and Torrellano and nº 11 high schools are entirely under control of
Conselleria.
The main purpose of the refurbishments in Elche is to put and end to the use of
barracks, which 6 of the educational establishments have been using for over 20 years in
some cases. There are also other issues that need to be addressed, such as the presence
of asbestos on the walls and roofs.
The long wait for these interventions has produced multiple protest marches within
the educational community. Over the course of two years, the majority of these works will be
completed assuming there will be no more delays.
|
Keywords/Subjects: barracones centros públicos Plan Edificant Elche obras barracks public centres building works |
Knowledge area: CDU: Generalidades.: Periódicos. Prensa. Periodismo. Ciencias de la información |
Type of document: application/pdf |
Access rights: info:eu-repo/semantics/openAccess |
Appears in Collections: TFG- Periodismo
|