Buscar por Autor 8d85c704-588f-4b1f-8a22-732256640763
Mostrando resultados 1 a 3 de 3
Vista previa | Fecha de publicación | Título | Autor(es) | Acceso |
---|---|---|---|---|
2021 | Conceptual and preliminary design of a shoe manufacturing plant | |||
13-ene-2024 | Optimization of the pick-and-place sequence of a bimanual collaborative robot in an industrial production line | Borrell Méndez, Jorge; Perez-Vidal, Carlos; Segura-Heras, José Vicente | ||
10-nov-2020 | Robotic Pick-and-Place Time Optimization: Application to Footwear Production |